
This report is for the benefit of Narec, its subsidiaries, representatives and beneficiaries including the landlord TCE, Narec’s prospective turbine manufacturer tenants of the Blyth Offshore Demonstrator site and their representatives.
The advice is based on Natural Power’s experience in on-site wind data collection
and an initial wind resource assessment based on recorded wind data and various computer models.
The Design of Anemometry Campaign is available here to download.
You are here: » Design of Anemometry Campaign
Anemometry Campaign turbine manufacturer tenants of the Blyth Offshore Demonstrator site, Technology commercialisation,Renewable energy,Energy research,Technology development,Technical due diligence,Prototype renewables design,Large scale renewables testing,Risk mitigation,Offshore wind,Onshore wind,wind energy,wind turbine testing,turbine development,Marine renewables,Wave devices,Tidal generation,Power takeoff,Distributed generation,on-site generation,Dispersed generation,Embedded generation,Decentralized generation,Decentralized energy,Decentralised energy,Microrenewables,Concentrator PV,Commercialise,Technologies,Grid Integration,Renewable Energy,Wind,Wave,Tidal,Solar PV,Thermal,Power,Electrical Network,Wind turbine blade testing,Drive train testing,Grid Integration,Renewable Energy,Wind,Wave,Tidal,Solar PV,Thermal,Power,Electrical Network